Structural Gass

Structural Glass

The first contract consists of the latest structural glass shopfront which was fitted in September and was situated in The Drakes Shopping Centre in Plymouth and consisted of 19mm glass fins bolted together at mid point with steel splicing plates with the shopfront glass plates being bolted back to the fins all fitted within a stainless steel frame, the second contract consists of a toughened laminated structural glass shopfront with glass doors and lobby with steel posts, framing consists of brushed stainless steel angles to the perimeter, patch fittings for the doors and steel brackets bolting the structure together. The second consists of a thick toughened laminated glass butted together without fins all fitted within a brush stainless steel perimeter frame and 100 x 100mm steel posts to create an entrance to the 5 no units. The next contract consisted of supply and installing all new structural glass set into channels top and bottom for 2 areas within Wembley Football Stadium and the last was 9 no structural glass shopfronts in a shopping centre in Barnstaple. Please contact us for more information or a quote.