ACJ Glazing Solutions Ltd delivers complex, high‑precision glazing installations for commercial, retail and domestic environments across the UK. Our team provides full end‑to‑end service - including survey, drawings, structural calculations, and installation - supported by specialist lifting equipment and extensive experience working in restricted and operational retail environments.
Please browse a selection of our work below: click the arrows to read more.
Scope:
Full design, fabrication, and installation of a high-security steel curtain walling system and bespoke commercial entrance for a high-end retail client, incorporating elite security glazing and premium bespoke finishes.
Curtain Walling & Door System
Wright Style steel curtain walling system, fabricated with pressure plate and cover cap detailing
Heavy-duty steel commercial entrance door, also fabricated using Wright Style systems
Main structural framework powder-coated in black; entrance door and over-panel finished in a bespoke gold
Security Glazing
Vetrotech 23mm P7B security glass — one of the highest security ratings available for retail applications
Four full-height screens, each panel weighing approximately 400kg
Glass installed using specialist Glass Worker machinery for millimetre-accurate, safe positioning
Bespoke Materials
Full-height screens incorporate solid marble panels alongside custom aluminium composite panels with a timber core for structural integrity
Outcome:
A striking, high-security retail façade that combines structural performance with a premium aesthetic. The bold contrast between the powder-coated black framework and bespoke gold door detailing delivers a distinctive, luxury finish. Phase two will see the installation of bespoke gold "picture frame" over-cladding to complete the storefront.
*project details coming soon*
Scope:
Removal of existing timber frontage screens and installation of a new aluminium curtain walling and commercial entrance system (single unit shown).
This project involved upgrading an outdated timber shopfront with a modern, thermally efficient aluminium glazing solution, improving both appearance and performance.
Curtain Walling System
Reynaers CW 50 Curtain Walling System
Supplied and installed in stick form
Complete with pressure plates and external cover capping
Standard Reynaers head and foot brackets
External appearance prioritised (viewed from outside)
Commercial Entrance Doors
Vision 7 Thermally Broken Commercial Door System
Single hook lock with key/key cylinder
Satin anodised pad handles
Concealed overhead closer (NHO)
Low-threshold detail for improved accessibility
Glazing Specification
6mm clear toughened Low-E double-glazed vision units
Outcome: A clean, contemporary shopfront replacing tired timber screens, delivering improved thermal performance, durability, and a professional commercial appearance.
Scope:
Supply and installation of a high-specification curtain wall façade and integrated entrance package.
ACJ Glazing Solutions Ltd successfully delivered the curtain walling façade at The Priestley Centre, demonstrating our ability to combine complex structural engineering with a sleek, contemporary architectural finish.
Curtain Walling System
Alutech Curtain Walling System
Bespoke façade engineered to span tall elevations while maintaining a seamless all-glass appearance
Designed to maximise natural light while ensuring thermal and structural performance
Structural Engineering
200mm deep mullions providing enhanced vertical strength and wind-load resistance
205mm deep transoms delivering rigid horizontal stability across wide spans
Precision alignment and detailing for a high-quality architectural finish
Glazing Technology
10mm SKN toughened double-glazed units
Toggle-glazed installation with no external pressure plates or caps
Flush, continuous glass surface for a true "all-glass" aesthetic
SKN coating provides solar control while maintaining high transparency
Entrance Integration
Automatic revolving door acting as an airlock to support internal climate control
Manual swing door integrated within the façade for accessibility and compliance
Outcome:
A striking, modern façade delivering structural integrity, energy performance, and a refined architectural presence. The contract also included replacement of approximately 800 double-glazed units, installation of all entrance doors around the building, new courtyard screens, and internal respraying of all windows.
Contract value: approx £800k.
Scope:
Supply and installation of aluminium glazing systems across three new-build residential properties.
This project formed part of a multi-home development in Cranleigh, delivered for A2 Dominion, featuring a coordinated range of Comar aluminium window, door, and bifold systems.
Gable End & Window Walling
Comar 9Pi Window Wall System (thermally broken)
Comar 9Pi Mitre Window System
Comar 9Pi Rebated Door System
Lever/lever door handles with multipoint locking
Restricted window hinges and shootbolt locking
Slot trickle vents for controlled ventilation
Bi-Fold Doors
Comar 7Pi+ Bifold Door System
Smart door hardware
150mm cills and head packers
Slot trickle vents
Side-Hung & Top-Hung Windows
Comar 5Pi ECO+ Window System
Handle-operated side- and top-hung configurations
Restricted hinges and shootbolt locking
Slot trickle vents
150mm cill profiles
Outcome: A high-quality residential glazing solution combining thermal performance, security and clean architectural lines, delivered consistently across multiple dwellings.
Scope:
· Short-notice removal of existing shopfront glazing in an extremely restricted workspace.
· Required lifting glass from a mezzanine level due to zero access at shopfront height.
· Deployed a compact remote‑controlled crane positioned and secured on the mezzanine.
· Operated through a narrow gap between mezzanine edge and hoarding, well within the crane’s safe working reach (>8m).
· Vacuum lifting equipment enabled safe securing and controlled removal of glass.
· Glass was lowered onto trolleys below for safe disposal.
· Works completed smoothly, with detailed risk management and coordination.
Outcome: Successful removal in a uniquely confined environment, demonstrating our ability to undertake specialist glazing tasks that many providers would be unable or unwilling to attempt.
Scope:
· Survey, calculations, drawings, and full installation of a premium structural glass frontage.
· Installed 13.5mm clear laminated toughened heat‑soaked glass, fixed using brushed stainless‑steel angles, channels, brackets, and bolts.
· Glass was structurally tied back to 19mm toughened heat‑soaked fins.
· All materials brought in out of hours; works completed behind hoarding to minimise disruption.
· Glazing installation carried out entirely from inside the unit using a spider crane and vacuum lifters.
· Glass positioned using coordinated teams working from towers and scissor lifts.
Outcome: A striking, open entrance that enhances visibility and elevates the overall retail environment.
Scope:
· Survey, drawings, structural calculations, and installation of full‑height structural glass for four retail units.
· Installation of 30 large glass panels (1980 × 3600mm, 17.5mm toughened laminated glass).
· Panels - each approx. 300kg - had to be moved through a restricted 2m‑high entrance, requiring millimetre‑accurate manoeuvring.
· Utilised a 2‑tonne G20 pick‑and‑carry crane and an MRT4 vacuum lifter to transport and position each panel.
· Panels were installed into stainless steel perimeter framing and boxed frames for roller shutters.
· The MRT4’s slim 292mm profile enabled installation behind tight structural beams.
Outcome: Successful delivery of a technically challenging project under strict spatial constraints, completed safely and with precision.
Contact our team for a free survey and quotation, or to discuss your technical requirements.
Tel: 023 8000 1727
Mobile: 07917 364092
Email: alan@glass-solutions.co